The loading bay is one of the busiest areas in large warehouses and distribution centres and must be perfectly designed for productive and efficient operations.

At BID Group we like to help our customers solve problems, and in this case, our client, a major UK supermarket retailer, needed a solution to adapt their distribution centre as the existing roof was too low to accommodate the height of double deck trailers.

Three loading pods were installed on the exterior of the building with the required height to provide shelter for goods and employees during the loading and unloading process.

Manufactured at our production facility in Bolton, the pods were installed complete with dock levellers, wheel guides, fully inflatable dock shelter, dock buffers, traffic lights and new internal loading bay door.

If you need a solution to a problem contact us for a free site survey www.bidgroup.co.uk