BACKGROUND

When Swiss industrial engineering and manufacturing firm Sulzer, who are a leading global behemoth of flow control and applicators into the oil and gas, power, and water markets – needed more storage space, it turned to Aganto for the solution.

REQUIREMENT

Sulzer needed to upgrade and replace previous lean-to type structure (can be seen in photos); therefore a more secure and enclosed solution was required. Response time is key to temporary storage buildings and workshop units.

They needed to ensure it could carry the stock required to support its customer’s needs. The company wins business on the ability to deliver the breadth and depth of service that these utility industries demand. A key element is the ability to provide equipment services, whether in workshops or on-site, they encounter a reoccurring challenge as each regional business unit grows its market share – they need more space.

SOLUTION

Aganto recommended a 7.5m span x 12.5m length x 4.2m eaves temporary building with an insulated roof to stop condensation on stored parts (see photos). Sulzer purchased the building and have been able to continue their operations without any delays, disruption or hassle.

BENEFIT

It greatly helped that Aganto had already supplied their (much larger) Leeds depot the previous year and built up a strong and trusting relationship with Sulzer. Aganto can provide FREE ADVICE and a range of options from purchase of new or used temporary building to long or shortterm rental. It’s the most flexible way to balance the needs of a business potential without the hold-ups or expense of extending through conventional buildings or moving to another site. It starts with a free site visit and expert appraisal of your needs together with the range of possible options.

Aganto. Professional quality buildings, professional quality service.

AGANTO

Email: roxley@aganto.co.uk

Comments are closed.